Ryoso Water: From the Main Canal to the Fields

Low ground in northern Chiba could become waterlogged when rainwater had nowhere to drain. Farther southeast, fields on the Kujukuri Plain lacked irrigation water. The Ryoso irrigation and drainage scheme addressed both problems within a connected network.

The contrast between flooding and drought in the Chiba overview therefore involves more than two unrelated places. Yet moving water from north to south required more than opening a channel across a convenient slope.

Draining low ground and lifting water

In his 1961 study, Iwase described lowlands beside the Tone River where gates had to be closed when river levels rose. Closing them also prevented water inside the protected area from escaping. On the Kujukuri side, small rivers, ponds and arrangements for lifting water from low ground supplied fields, but could not always meet demand during drought.

The Ryoso scheme combined better drainage in the north with the transfer of Tone River water towards the south. The Shimosa Plateau lay between them. Water had to be raised, carried through channels and rivers, and lifted again at another pumping station. A continuous line on a plan could contain several changes in height that pumps had to overcome.

Work beyond the main canal

Iwase wrote while construction was still under way. Even where the main canal could carry water, farmers needed branch channels and works within their fields before they could use it. Construction undertaken by the national government, the prefecture and local bodies did not all advance at the same pace.

The later official chronology records different completion dates for the national works and the prefectural branches: 1965 for the main scheme and 1973 for the branches. Connecting a source to a major canal was one task; connecting that canal to the land it served was another.

The farming calendar changed too

Iwase also considered the spread of earlier rice planting. Farming practices were changing while the water network was being built. Demand involved both an annual quantity and the time when water was needed. Moving planting earlier could alter the supply required in a particular part of the season.

A description confined to the finished structures would miss these different timescales. Lowlands needed drainage, raised ground had to be crossed, branches had to reach the fields, and water had to arrive when cultivation required it. Those connections turned water at an intake into water that could be used on a farm.

References

  • 石井進・宇野俊一編『千葉県の歴史』第2版、山川出版社、2012年。ISBN 9784634321212。書誌。
  • 岩瀬和博「両総用排水事業と九十九里平野農業」『人文地理』13(3)、1961年、251–257頁。本文。
  • 大網白里町史編さん委員会編『大網白里町史』大網白里町、1986年。「両総用排水事業」。公式公開本文。
  • 関東農政局「両総農業水利事業の概要」。公式解説。
  • 両総土地改良区「沿革」。事業年表。