How Orders Fit Mino’s Kilns
Moving through heat, or firing one load
Mino pottery is made around Toki, Tajimi and Mizunami in southeastern Gifu Prefecture, in central Honshu. A row of finished plates does not reveal the kiln that fired them. Yet a kiln’s operation affects how orders can be grouped into production.
In a tunnel kiln, cars loaded with pottery move slowly through areas for preheating, firing and cooling. Sending one car after another through the kiln allows continuous production.
A shuttle kiln also uses a movable car, but the load enters for a firing cycle and is then taken out. Firings can be scheduled to suit the amount of work. The important distinction is not simply the presence of wheels: it is whether production proceeds continuously or in separate loads.
Work before and after the kiln
Tono Toki, a manufacturer in Toki, publishes a process description showing separate tunnel kilns for the first, biscuit firing and the later main firing. Decoration and the application of glaze appear between them. The sequence includes hand painting as well as automatic equipment.
This is one company’s process, not a universal method for Mino pottery. It nevertheless makes clear why installing a kiln does not automatically turn every preceding and following task into one uniform operation. Firing is one stage: there is also the work that brings pieces to the kiln and the work done after they come out.
Variety can also be produced in volume
Kasahara’s 2024 study examines responses to declining demand through research conducted between 2018 and 2023. One anonymised manufacturer, company B, combined mechanisation with production and inventory management systems. It made a wide variety of products, serving different uses and price levels, while maintaining high-volume production.
Variety does not necessarily imply a move to small batches. Many designs can also be combined within a large overall output. The equipment differences introduced in the Gifu overview do not amount to a simple division between large factories making identical objects and small workshops making diverse ones.
The study identifies movement towards varied, small-volume production among some shuttle-kiln operators, while tunnel-kiln operators tended to emphasise efficiency supporting larger volumes. This was an investigation of companies’ responses, not an experiment proving that a particular kiln would secure a business’s future.
Where sales fit the firing schedule
Sales channels mattered too. In Kasahara’s survey, tunnel-kiln operators rarely reported running their own shops or participating in pottery festivals. The study discusses the difference between the limited quantities sold through such channels and the larger orders, including commercial tableware, placed through wholesalers.
Selling directly to consumers can establish new relationships. It does not necessarily generate an order volume suited to every production system. “Finding another sales channel” can mean different things depending on the amount of work a manufacturer needs to bring together.
The account of the Hida pottery district published by Gifu’s federation of small-business associations in Toki—Hida written 肥田, distinct from the mountainous Hida region farther north—also describes feeding consumers’ responses at exhibitions back to member firms to inform new products. This is an association’s own account, rather than a comparative measurement of results. It nevertheless records a flow of information from outside the factory into decisions about what to make.
Behind a variety of finished pots are two connected tasks: developing the designs and arranging work into loads that can be fired. A single car moving through a tunnel kiln is only part of the work. Production also depends on the tasks before and after firing, the next car and the next order.