Kawaminami’s Irrigation Needs More Than a Supply of Water

For farmers in Kawaminami, on the Pacific coast of central Miyazaki Prefecture, getting water from a river or reservoir was not enough. Equipment spraying it over a field also needed usable pressure. The height at which water travelled—and where it was allowed to drop—affected how it could be used.

A canal with more than one purpose

The Kawaminamibaru rice-field development plan combined water supply with power generation on the Omaru River and flood regulation. Part of the main canal was to be shared with the supply to Kawabaru power station. Several purposes met at the same water source.

Responsibility for construction was divided too. Under the plan, the national government would build the main canal, the prefecture the branches and settlement facilities, and local associations the roads, channels and cleared farmland within the area. Funding and construction responsibilities changed along the route from source to fields. The expansion of farmland discussed in the Miyazaki overview involved this combination of facilities.

The last stage of irrigation

After the war, irrigation for upland fields at Karasebaru was planned using Aoshika reservoir as the source. At first, the intention was to run water between crop rows. Sprinkler trials were added later.

In some places, however, releasing reservoir water into a lower open channel left insufficient pressure for spraying. Even with water stored high upstream, the way it was carried could prevent that height from being used to spray the fields. Water quantity was also limited, and later, mud and debris entering through open channels and regulating ponds caused clogging.

Installing equipment did not ensure its continued use. Large rain guns encountered problems including the mismatch between a circular spray pattern and rectangular plots, and the labor needed to move them. Their use reportedly did not continue. Supplying water and finding a spraying method farmers could use were separate problems.

Reconnecting storage and fields

The Kyushu Regional Agricultural Administration Office lists the Osuzu project as running from fiscal 1996 to 2013. It included the new Kirihara dam, changes to the intake and outlet facilities of the existing Aoshika dam, water conveyance facilities and farm ponds. Related prefectural works were to provide irrigation equipment nearer the fields.

The request for a fully piped supply described in Suido no Ishizue concerned more than repairing ageing structures. Farmers also wanted to use the pressure available from the reservoir’s elevation. Additional storage and the way water reached the fields were addressed together.

Uses extended beyond watering crops during growth. The agricultural administration’s account also describes trials of sprinkler irrigation for frost protection and pest control in tea fields. These are records of the trials and project objectives, not measurements of every farm’s current practices or financial results.

Following Kawaminami's irrigation on a facilities map shows the roles of the reservoir, the channels along the way, the height of the fields and the final spraying equipment. Even a continuous water route on the map did not mean that the water could be used in the same way at its destination.