When Did the Hii River Turn East?

In Shimane, on the Sea of Japan coast of western Honshu, the Hii River crosses the Izumo plain and enters Lake Shinji to the east. That present course cannot simply be projected backward. Traces of westward flow remain in the plain, and old maps show channels unlike today's. A change in the river's course also changed where its sediment went.

Accounts often connect that change with seventeenth-century floods. But an increase in river influence, a shift of the main channel and the engineering of a single course need not be the same event. The overview of Shimane follows sediment between mountains and lowlands. Here the question is how that movement acquires a date.

A boundary in the lake bed

Material carried into a lake accumulates on its floor. A sediment core, a narrow column extracted from those deposits, preserves a sequence that researchers can examine from younger layers toward older ones. It does not arrive with a calendar attached.

A 2006 study of Lake Shinji examined grain sizes and chemical composition. It distinguished fine material supplied by the Hii from coarser material transported by density currents on the eastern, Ohashi River side. The issue was not simply whether the mud was coarse or fine, but how different material reached the lake floor.

The researchers identified a change in sedimentation in two cores and interpreted it as the addition of the Hii's influence. This gave them evidence within the lake for a change in the river's contribution. Looking at the present mouth alone could not provide that sequence.

Where did the date come from?

The study's discussion contains an essential qualification. Although it connects the environmental change with eastward flow, it questions whether the event necessarily occurred in 1635 or 1639. For its analysis, it adopts 1639 from documentary history.

The change in the mud was observed in the lake bed, but its year was taken from historical documents. We cannot call 1639 a date established by the sediment measurements alone. The year assumed by the paper and what its measurements showed need to be kept separate.

Even without a settled date, the lake sediments show that the way material accumulated changed. But when the thickness deposited over an interval is converted into an annual rate, where that interval begins affects the calculation. Separating what was observed directly from what was borrowed from another record makes the strengths of the research easier to see.

An old map has more than one date

A map appears to offer a more direct answer: there is the river, drawn across the plain. Yet the date of the surviving sheet and the date of the landscape it represents can differ. A later copy may preserve earlier village names or channels. Dating the paper does not automatically date every feature on it.

A 2021 study of early Edo-period maps examines this distinction through the positions of villages, roads and waterways. Its reconstruction separates branching flow, flooding, land development and subsequent consolidation of channels. Evidence that water reached the east does not by itself show that all the river's flow already followed one permanent course.

Old maps record place names and the positions of features; the lake bed preserves changes in the material flowing into it. Both investigate eastward flow, but they examine different things. Each needs to be checked for what it can establish and compared with the other, rather than used alone to explain every change in the river.

The plain was not made in one flood

The geomorphological work discussed in the Shimane overview places the Izumo plain's formation well before the early modern period. Later channel engineering and sediment from iron-sand extraction entered an already developing landscape. A change of river course cannot serve as the birth date of the entire plain.

Three more precise questions help: when did water flow eastward, when did the lake receive a stronger sediment contribution, and when were channels consolidated by engineering? Each requires evidence suited to it. Their answers may overlap without collapsing into a single event.

The present Hii is one visible course across the plain. Behind it lie different timescales for floods, embankments, branches and deposition. When an explanation gives the river a single turning point, the useful next step is to ask which of those changes the date actually describes.

References

  • 瀬戸浩二・中武誠・佐藤高晴・香月興太「斐伊川の東流イベントとそれが及ぼす堆積環境への影響」『第四紀研究』45(5)、2006年、375–390頁。本文。
  • 大矢幸雄「絵図・地図からみた斐伊川東流」『松江市史研究』12、2021年、63–74頁。島根大学公開冊子。
  • 林正久「出雲平野の地形発達」『地理学評論 Ser. A』64(1)、1991年、26–46頁。本文。
  • 内藤正中『島根県の歴史』県史シリーズ32、山川出版社、1969年。NDL書誌・閲覧条件。

Analytics cookies