The Joban Line's Reopening and the Rebuilding of Life in Hamadori
Introduction
On March 14, 2020, trains resumed between Tomioka and Namie. This was the final section still suspended after the Great East Japan Earthquake, completing the Joban Line's reopening.
Along the line, the lifting of evacuation orders, residents' return, and the rebuilding of shops and medical services follow different schedules and conditions.
Rail services and evacuation orders around stations
When the full line reopened in 2020, ordinary trains were joined by three daily round trips of the Hitachi limited express between Shinagawa/Ueno and Sendai. Direct services between the Tokyo area and Sendai returned.
Before reopening, dates were set for lifting evacuation orders early in parts of the Specified Reconstruction and Revitalization Base Areas in Tomioka, Okuma and Futaba. Rail reopening and the lifting of orders around stations were coordinated.
Even where a station is accessible, entry or residence may be restricted in surrounding areas.
Lifting orders also involves everyday infrastructure
Conditions for lifting evacuation orders have included radiation criteria; electricity, gas, water, sewerage, transport and communications; medical, care and postal services; decontamination progress; and consultation with the prefecture, municipalities and residents.
Orders were lifted in stages by area. Areas outside difficult-to-return zones and Specified Reconstruction and Revitalization Base Areas followed different processes.
Where to live after an order is lifted is also an individual choice. Work, housing, schools and family circumstances differ, and residents do not all return on the day an order is lifted.
Everyday challenges after roads and railways reopen
The Fukushima Reconstruction and Revitalization Plan, whose changes were approved in March 2026, records the Joban Line's full reopening and progress on roads. It also identifies roughly 23,000 people still evacuated as of February 2026, difficult-to-return zones, population decline and aging.
A reopened road does not necessarily provide enough places to shop or seek treatment. Alongside housing, people need care, childcare and education services in their daily lives. A facility being open does not always mean that people can use the services they need.
Progress on infrastructure described in the plan cannot establish residents' satisfaction or intentions to return.
Check current information for the place you will visit
Before visiting Hamadori, check current national, prefectural, municipal and transport operator notices for service status, evacuation-order areas and entry conditions at your destination and along your route, and whether facilities are receiving visitors. The reopening dates and plan figures given here do not establish travel conditions or safety on a particular day.
References
- 東日本旅客鉄道株式会社「常磐線(富岡駅~浪江駅間)の運転再開について」2020年1月17日。https://www.jreast.co.jp/press/2019/20200117_ho01.pdf
- 復興庁「復興政策10年間の振り返り 7章2節 帰還・移住等の促進、生活再建等」。https://www.reconstruction.go.jp/311kyoukun/archive/chapter7-verse2.html
- 福島県「福島復興再生計画」2026年3月17日変更認定。https://www.reconstruction.go.jp/files/user/topics/main-cat1/sub-cat1-4/20260317_fukkousaiseikeikaku_honbun.pdf
- 経済産業省「原子力被災者支援・避難指示関係」。https://www.meti.go.jp/earthquake/nuclear/kinkyu.html
- 丹波史紀・清水晶紀編著『ふくしま原子力災害からの複線型復興―一人ひとりの生活再建と「尊厳」の回復に向けて』ミネルヴァ書房、2019年6月、x,310頁。ISBN 9784623086726. CiNii Books
- 大石嘉一郎編『福島県の百年』山川出版社〈県民100年史7〉、1992年11月、6,364,28頁。ISBN 4634270706. CiNii Books Relevant pages: 352–355. NDL original. Background on industry and power-station development before 2011.
- 田村俊和・石井英也・日野正輝編『日本の地誌4 東北』朝倉書店、2008年。ISBN 9784254167641. CiNii Books