Skip to content
Voyafield
← All articles

· English

Aizu's Snow and the Work of Keeping Roads Usable

Introduction

Snow amounts vary greatly across Aizu in winter. Even climate normals covering the same 30 years show a large difference in snow depth between Wakamatsu in the Aizuwakamatsu Basin and Tadami in Oku-Aizu.

To keep roads usable even in areas with heavy snow, snowplows push fresh snow aside and scrape away compacted snow, clearing a path for traffic.

Different snow amounts in Wakamatsu and Tadami

Annual snowfall totals and maximum snow depth. Normals for 1991–2020. The left panel shows total new snowfall; the right shows maximum snow depth. The panels use separate scales.
Annual snowfall totals and maximum snow depth. Normals for 1991–2020. The left panel shows total new snowfall; the right shows maximum snow depth. The panels use separate scales. Drawn by Voyafield from the sources cited in the article.

The Japan Meteorological Agency's 1991-2020 normals show an annual snowfall total of 328 centimeters and an annual maximum snow depth of 59 centimeters at Wakamatsu. Tadami's figures are 1,233 and 231 centimeters. Snow amounts differ this much within a single prefecture. For these normals, the depths of newly fallen snow are added for each year, then averaged over 30 years. The annual maximum snow depth is also averaged over the same 30 years, using the deepest snow cover recorded in each year.

Snow amounts differ greatly between Wakamatsu and Tadami, even though both are in Aizu.

Machines do different work as snow conditions change

According to the Aizuwakamatsu national road office, its clearance area covers 91.8 kilometers: the usual 77.3 kilometers plus 14.5 kilometers assigned in winter. Three clearance stations, at Inawashiro, Aizuwakamatsu and Nishiaizu, cover them. This is one national office's network, not all roads in Aizu.

Fresh snow is pushed to the shoulder; compacted snow and ruts are scraped. When roadside snow narrows the carriageway, widening or removal becomes necessary. Work also includes removing overhanging snow, known as snow cornices, at tunnel entrances and preventing ice formation. Snowplow trucks, graders, rotary snow blowers and de-icing spreaders are used for their respective tasks.

Continued snowfall means repeated work on the same section. Available vehicles, operators and priorities affect how much can be covered.

Aizuwakamatsu's fiscal 2026 policy statement reported that, following the heavy snow of February 2025, the city had revised dispatch criteria, added snow-clearance vehicles and assigned teams to prioritize the removal of snow piles at major intersections during fiscal 2025.

Snow can remain at the door after the road is cleared

Road clearance can leave snow at entrances. Illustrative winter street after plowing: roadside snowbanks and entrance access, not a record of a specific property or day.
Road clearance can leave snow at entrances. Illustrative winter street after plowing: roadside snowbanks and entrance access, not a record of a specific property or day.

Fukushima's Kitakata Construction Office identifies 313.8 kilometers of carriageway and 87.0 kilometers of sidewalk for clearance. It also asks people not to park on roads or put household snow onto them.

Snow pushed to the shoulder may remain in front of a door or garage. The Kitakata Construction Office asks residents to clear this snow themselves. Health, household composition and working hours can make this difficult.

Check winter conditions for the actual destination

Central Aizuwakamatsu, Inawashiro, Tadami and Minamiaizu differ in snow amounts and in the roads and transport services used to reach them. Use normals to understand broad patterns, then check forecasts, road restrictions and rail and bus operations before departure.

References

Analytics cookies

Allow Google Analytics cookies to measure page visits? Change your choice anytime in Analytics settings. Privacy details